Material Comparison Guides

In-depth comparisons of engineering plastics, helping you choose the right material for your application

Use the comparison to build a material shortlist

These guides compare resin families and modification options for plastic pellets used in molded parts. Start with the demands of your application, then open the relevant comparison below. A family-level comparison helps narrow the choice; it does not replace the current datasheet, a quotation for a specific grade, or a trial in your own mold.

  1. What information helps you recommend a modified resin grade?

    Describe the part, molding process and service environment. Include operating temperature, moisture or chemical exposure, load, impact and dimensional requirements. State the preferred resin, glass-fiber content, flame rating and test thickness, color and appearance target. If available, share the current grade and TDS, the problem you want to solve, trial quantity and delivery destination. This makes the recommendation and quotation specific to your project.

  2. How should I compare two technical datasheets?

    Compare the exact grades under matching test methods and conditions. Check units, specimen thickness, dry or conditioned state, and the direction of testing for reinforced materials. Separate typical datasheet values from agreed delivery specifications. A flame-test result at one thickness does not confirm performance at another thickness, and a TDS is not a certification document. Ask for clarification where the test basis differs before ranking the materials.

  3. How do I validate a replacement material before ordering?

    Use the comparison to select candidates, then request the current grade-specific TDS and processing guidance. Plan a mold trial and define acceptance criteria before the test. Record drying, melt and mold settings, part dimensions, appearance and the performance checks required by your application. Approve the material only after reviewing the relevant results. Confirm grade, color, quantity, packaging and trade terms in the quotation before a production order.

Discuss your material shortlist →